Current time: 9:07:43AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at 6 ST SW on WB 6 AV SW going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:07:43AM. Waiting 1:06:43. 7:12 behind 8:18:00AM Vehicle 8225 Load 127%? Last seen 1:06:43
2: 0:00 Mins at 9:07:43AM. Waiting 1:14:40. 1:15 behind 8:42:00AM Vehicle 8036 Load 75%? ↩ Last seen 1:06:40
3: 0:00 - 2 Mins at 9:07:43AM. Waiting 1:07:03. 1:12 behind 9:06:00AM Vehicle 8209 Load 100%? ↩ Last seen 1:06:48
4: 26 - 32 Mins at 9:34:37AM. Waiting 1:06:43. 7:15 behind 9:30:00AM Vehicle 8225 Load 125%? ↩ Last seen 1:06:43
5: 45 - 51 Mins at 9:53:19AM. Waiting 1:14:40. 1:44 behind 9:54:00AM Vehicle 8036 Load 77%? ↩ Last seen 1:06:40
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.