Current time: 7:43:08AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at 31 AV NW on NB Cambrian DR going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 21 - 25 Mins at 8:04:31AM. 0:12 ahead of 8:06:00AM Vehicle 8209 Load 104%?
2: 46 - 49 Mins at 8:29:40AM. Waiting 12:37. 0:04 ahead of 8:31:00AM Vehicle 8225 Load 105%? ↩
3: 1h10 - 1h16 Mins at 8:53:50AM. 0:30 behind 8:55:00AM Vehicle 8036 Load 102%? ↩
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.