Current time: 9:02:37AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at 60 AV NE on SB 4 ST NE going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:02:37AM. Waiting 1:09:34. 0:50 behind 8:14:00AM Vehicle 8036 Load 78%? ↩ Last seen 1:01:34
2: 0:00 Mins at 9:02:37AM. Waiting 1:01:57. 0:32 behind 8:38:00AM Vehicle 8209 Load 99%? ↩ Last seen 1:01:42
3: 3 - 10 Mins at 9:05:47AM. Waiting 1:01:37. 6:19 behind 9:02:00AM Vehicle 8225 Load 124%? ↩ Last seen 1:01:37
4: 21 - 36 Mins at 9:24:21AM. Waiting 1:09:34. 6:58 behind 9:26:00AM Vehicle 8036 Load 103%? ↩ Last seen 1:01:34
5: 47 - 53 Mins at 9:49:39AM. Waiting 1:01:57. 1:41 behind 9:50:00AM Vehicle 8209 Load 78%? ↩ Last seen 1:01:42
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.