Current time: 8:03:07AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at Grier AV on SB 4 ST NE going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 11 - 16 Mins at 8:14:36AM. Waiting 10:04. 0:33 behind 8:16:00AM Vehicle 8036 Load 76%? ↩ Last seen 2:04
2: 32 - 40 Mins at 8:35:18AM. 0:22 ahead of 8:40:00AM Vehicle 8209 Load 92%? ↩ Last seen 2:12
3: 1h04 - 1h11 Mins at 9:07:28AM. 5:57 behind 9:04:00AM Vehicle 8225 Load 121%? ↩ Last seen 2:07
4: 1h22 - 1h38 Mins at 9:25:54AM. Waiting 10:04. 7:00 behind 9:28:00AM Vehicle 8036 Load 100%? ↩ Last seen 2:04
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.