Current time: 9:02:51AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at Norfolk DR NW on NB 64 AV NW going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:02:51AM. Waiting 1:02:11. 3:20 ahead of 8:17:00AM Vehicle 8209 Load 103%? Last seen 1:01:56
2: 0:00 Mins at 9:02:51AM. Waiting 1:01:51. 3:36 behind 8:42:00AM Vehicle 8225 Load 128%? Last seen 1:01:51
3: 0:09 - 5 Mins at 9:03:00AM. Waiting 1:09:48. 1:14 ahead of 9:06:00AM Vehicle 8036 Load 80%? ↩ Last seen 1:01:48
4: 23 - 27 Mins at 9:26:33AM. Waiting 1:02:11. 2:23 ahead of 9:30:00AM Vehicle 8209 Load 95%? ↩ Last seen 1:01:56
5: 52 - 57 Mins at 9:55:02AM. Waiting 1:01:51. 2:42 behind 9:54:00AM Vehicle 8225 Load 121%? ↩ Last seen 1:01:51
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.