Current time: 6:07:03PM Refresh
Remove ads by becoming a Premium User
• : 5-North Haven at 36 AV NE on NB Edmonton TR going North Haven
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 3 - 8 Mins at 6:10:39PM. 16:47 behind 5:55:00PM Vehicle 8036 Load 170%?
2: 8 - 13 Mins at 6:15:21PM. 2:20 behind 6:15:00PM Vehicle 8320 Load 56%?
3: 35 - 48 Mins at 6:42:47PM. 13:37 behind 6:35:00PM Vehicle 8139 Load 180%?
4: 41 - 54 Mins at 6:48:23PM. 0:53 behind 6:52:00PM Vehicle 8342 Load 14%?
5: 1h03 - 1h20 Mins at 7:10:10PM. 9:11 behind 7:08:00PM Vehicle 8036 Load 122%? ↩
Starting Monday, May 27 at 5 a.m. through Sunday, June 9 at 7 p.m., there will be lane closures 5 Avenue S.W. between 2 Street & 3 Street S.W. for Green Line utility construction work. Routes 5, 13 and 17 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.