Current time: 4:12:26PM Refresh
Remove ads by becoming a Premium User
• : 5-North Haven at Rosewood RD NW on SB Cambrian DR going North Haven
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 27 - 35 Mins at 4:40:15PM. 14:01 behind 4:31:00PM Vehicle 8139 Load 181%? ↩ Last seen 1:44
2: 38 - 45 Mins at 4:50:30PM. 0:51 behind 4:51:00PM Vehicle 8342 Load 34%? ↩
3: 1h03 - 1h12 Mins at 5:15:35PM. 6:41 behind 5:12:00PM Vehicle 8036 Load 134%? ↩
4: 1h18 - 1h28 Mins at 5:31:05PM. 3:04 behind 5:32:00PM Vehicle 8320 Load 82%? ↩
Starting Monday, May 27 at 5 a.m. through Sunday, June 9 at 7 p.m., there will be lane closures 5 Avenue S.W. between 2 Street & 3 Street S.W. for Green Line utility construction work. Routes 5, 13 and 17 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.