Current time: Refresh

Agencies » Calgary Transit

Remove ads by becoming a Premium User

 • : 5-North Haven at Rosewood RD NW on SB Cambrian DR going North Haven

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 27 - 35 Mins
at . 14:01 behind Vehicle 8139 Load 181%? Last seen 1:44

2: 38 - 45 Mins
at . 0:51 behind Vehicle 8342 Load 34%?

3: 1h03 - 1h12 Mins
at . 6:41 behind Vehicle 8036 Load 134%?

4: 1h18 - 1h28 Mins
at . 3:04 behind Vehicle 8320 Load 82%?


Starting Monday, May 27 at 5 a.m. through Sunday, June 9 at 7 p.m., there will be lane closures 5 Avenue S.W. between 2 Street & 3 Street S.W. for Green Line utility construction work. Routes 5, 13 and 17 will have stop closures.


The following stops will be temporarily closed:



  • EB 5 AV S.W. @ 3 ST S.W. (#8645) - Route 5

  • EB 5 AV S.W. @ 2 ST S.W. (#9957) - Routes 13 & 17


Please use the following stops in lieu of the closed stops:



  • EB 5 AV S.W. @ 6 ST S.W. (#9030) - Route 5

  • EB 5 AV @ Centre ST S (#2490) farside - Route 5

  • EB 5 AV S.W. @ 5 ST S.W. (#5147) - Route 13

  • SB 1 ST S.W. @ 6 AV S.W. (#2491) - Route 13

  • NB 4 ST S.W. @ 6 AV S.W. (#5452) - Route 17

  • NB Centre ST S.W. @ 4 AV S. (#5086) - Route 17

Started May 27 Until Jun 9

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.