Current time: 7:59:44PM Refresh
Remove ads by becoming a Premium User
• : 5-North Haven at 18 AV NW on SB 10 ST NW going North Haven
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 6 - 9 Mins at 8:06:07PM. 0:53 ahead of 8:08:00PM Vehicle 8320 Load 92%? Last seen 1:44
2: 48 - 54 Mins at 8:48:44PM. 19:37 behind 8:31:00PM Vehicle 8139 Load 192%? ↩
3: 52 - 56 Mins at 8:51:57PM. 0:10 ahead of 8:54:00PM Vehicle 8036 Load 14%? ↩
4: 1h13 - 1h17 Mins at 9:13:13PM. 0:32 ahead of 9:15:00PM Vehicle 8320 Load 91%? ↩ Last seen 1:44
Starting Monday, May 27 at 5 a.m. through Sunday, June 9 at 7 p.m., there will be lane closures 5 Avenue S.W. between 2 Street & 3 Street S.W. for Green Line utility construction work. Routes 5, 13 and 17 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.