Current time: 9:14:18AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 6 will be detoured.
Route 6 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Friday, May 17 at 8 a.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 8 Street S.W. @ 7 Avenue S.W. for LRT track work. Route 6 will be detoured.
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 6-Killarney/26 Av SW at 23 AV SW on NB 17A ST SW going →City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 33 - 38 Mins at 9:47:40AM. 4:53 behind 9:45:00AM Vehicle 8067 Load 125%? ↩
2: 59 - 1h04 Mins at 10:13:20AM. 0:08 ahead of 10:15:00AM Vehicle 8071 Load 83%? ↩
3: 1h27 - 1h32 Mins at 10:41:33AM. 0:56 ahead of 10:45:00AM Vehicle 8251 Load 97%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Starting Friday, May 10 at 7 a.m. through Tuesday, May 21 at 7 p.m., northbound lanes on 8 Street between 6 - 7 Avenue S.W. will be closed for construction.
Stop #5122 located on 8 Street @ 7 Avenue S.W. (nearside) will be temporarily closed. Please use the temporary stop located just across 7 Avenue S.W., ahead of the closed stop. Started May 10 7:00AM Until May 21 7:00PM
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.