Current time: 10:49:01AM Refresh
Remove ads by becoming a Premium User
• : 6-Killarney/26 Av SW at 39 AV SW on NB 51 ST SW going →City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 18 - 23 Mins at 11:08:00AM. 0:46 behind 11:09:00AM Vehicle 8004 Load 207%? ↩
2: 40 - 44 Mins at 11:29:16AM. 0:13 ahead of 11:32:00AM Vehicle 7798 Load 96%? ↩
3: 1h02 - 1h05 Mins at 11:51:53AM. 2:06 ahead of 11:55:00AM Vehicle 7989 Load 92%? ↩
4: 1h27 - 1h29 Mins at 12:16:52PM. 0:19 ahead of 12:18:00PM Vehicle 7849 Load 108%? ↩
Starting Monday, May 27 at 9 a.m. through Friday, June 7 at 3 p.m., there will be multi-lane closures at 17 Avenue S.W. between 7 Street & 8 Street S.W. for sidewalk replacement. Two-way traffic will be set up on 17 Avenue S.W. Routes 6 and 698 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.