Current time: 7:10:20AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 6 will be detoured.
Route 6 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Friday, May 17 at 8 a.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 8 Street S.W. @ 7 Avenue S.W. for LRT track work. Route 6 will be detoured.
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 6-Killarney/26 Av SW at Crowchild TR on EB 26 AV SW Overpass going →City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 27 - 30 Mins at 7:37:54AM. 0:34 ahead of 7:40:00AM Vehicle 8251 Load 103%? ↩
2: 57 - 1h01 Mins at 8:07:53AM. 0:41 ahead of 8:10:00AM Vehicle 8067 Load 100%? ↩
3: 1h28 - 1h32 Mins at 8:39:06AM. 0:43 ahead of 8:41:00AM Vehicle 8071 Load 103%? ↩
Starting Friday, May 10 at 7 a.m. through Tuesday, May 21 at 7 p.m., northbound lanes on 8 Street between 6 - 7 Avenue S.W. will be closed for construction.
Stop #5122 located on 8 Street @ 7 Avenue S.W. (nearside) will be temporarily closed. Please use the temporary stop located just across 7 Avenue S.W., ahead of the closed stop. Started May 10 7:00AM Until May 21 7:00PM
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.