Current time: 9:57:29AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 22 and 66 will be detoured.
Routes 22 and 66 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 66-Lakeview at 54 AV SW on SB Lakeview DR going ↓Lakeview
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 23 - 30 Mins at 10:20:29AM. 0:21 ahead of 10:26:00AM Vehicle 1340 Load 101%? ↩
2: 1h01 - 1h05 Mins at 10:58:36AM. 2:44 behind 10:59:00AM Vehicle 1865 Load 109%? ↩ Last seen 1:04
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.