Current time: 9:56:44AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 22 and 66 will be detoured.
Routes 22 and 66 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 66-Lakeview at Lakeview DR on WB 66 AV SW going ↑City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 3 - 5 Mins at 10:00:24AM. 0:54 ahead of 10:02:00AM Vehicle 1865 Load 97%? ↩
2: 39 - 42 Mins at 10:35:51AM. 1:20 behind 10:35:00AM Vehicle 1340 Load 107%? ↩
3: 1h11 - 1h16 Mins at 11:08:20AM. 2:36 behind 11:08:00AM Vehicle 1865 Load 104%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.