Current time: 10:14:25AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 22 and 66 will be detoured.
Routes 22 and 66 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 66-Lakeview at 34 AV SW on SB Sarcee RD going ↓Lakeview
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 2 - 3 Mins at 10:16:36AM. 0:45 behind 10:16:00AM Vehicle 1340 Load 103%?
2: 32 - 37 Mins at 10:47:19AM. 0:47 behind 10:49:00AM Vehicle 1865 Load 100%? ↩
3: 1h06 - 1h10 Mins at 11:21:16AM. 1:26 behind 11:22:00AM Vehicle 1340 Load 102%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.