Current time: 8:23:05AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 22 and 66 will be detoured.
Routes 22 and 66 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 66-Lakeview at Crowchild TR on WB 33 AV SW going ↓Lakeview
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:23:05AM. Waiting 22:03. 3:45 behind 8:02:00AM Vehicle 1340 Load 103%? Last seen 22:03
2: 13 - 18 Mins at 8:36:38AM. Waiting 22:08. 3:33 behind 8:35:00AM Vehicle 1865 Load 99%? ↩ Last seen 22:08
3: 45 - 51 Mins at 9:08:05AM. Waiting 22:03. 2:17 behind 9:09:00AM Vehicle 1340 Load 99%? ↩ Last seen 22:03
4: 1h19 - 1h24 Mins at 9:42:22AM. Waiting 22:08. 3:46 behind 9:42:00AM Vehicle 1865 Load 104%? ↩ Last seen 22:08
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.