Current time: 11:28:06AM Refresh
Starting Monday, March 4 at 5 p.m. through Monday, July 22 at 5 p.m., eastbound 33 Avenue S.W. between 19 Street & 22 Street S.W. will be closed for ATCO Utility Work. Route 7 will be detoured.
Eastbound route 7 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 7-Marda Loop at Crowchild TR on WB 54 AV SW going ↑City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 4 - 8 Mins at 11:32:25AM. 0:26 ahead of 11:35:00AM Vehicle 7995 Load 109%? ↩
2: 29 - 33 Mins at 11:57:25AM. 0:15 ahead of 12:00:00PM Vehicle 8025 Load 101%? ↩
3: 55 - 58 Mins at 12:23:53PM. 0:34 behind 12:25:00PM Vehicle 7925 Load 103%? ↩
4: 1h21 - 1h25 Mins at 12:49:20PM. 0:53 behind 12:50:00PM Vehicle 7995 Load 101%? ↩
Starting Monday, June 10 at 9 a.m. through Saturday, June 29 at 3 p.m., there will be westbound lane closures on 17 Avenue S.W. between 8 Street & 10 Street S.W. for sidewalk construction. Two-way traffic setup on the eastbound lanes. Routes 2, 7 and 698 will have a temporary stop closure.
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Starting Monday, June 10 through Friday, June 14 from 9 a.m. to 3 p.m. daily, there will be a southbound right-hand lane closure at 1 Street S.W. between 5 Avenue & S. of 6 Avenue S.W. for Green Line construction. Routes 7, 10, 13, 90 and 449 will have temporary stop closures.
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.