Current time: 7:00:03AM Refresh
Starting Friday, May 17 at 8 a.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 8 Street S.W. @ 7 Avenue S.W. for LRT track work. Routes 7 and 13 will be detoured.
Routes 7 and 13 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Starting Monday, March 4 at 5 p.m. through Monday, July 22 at 5 p.m., eastbound 33 Avenue S.W. between 19 Street & 22 Street S.W. will be closed for ATCO Utility Work. Route 7 will be detoured.
Eastbound route 7 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Saturday, May 18 at 9 a.m. through Wednesday, May 29 at 3 p.m., eastbound 33 Avenue between 19 - 22 Street S.W. will be closed for utility work. Route 7 will be detoured.
Eastbound buses will travel:
Remove ads by becoming a Premium User
• : 7-Marda Loop at 10 ST SW on WB 17 AV SW going ↓Marda Loop
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 1:27 - 2 Mins at 7:01:30AM. 1:17 behind 7:01:00AM Vehicle 8111 Load 71%?
2: 34 - 42 Mins at 7:34:46AM. 1:20 behind 7:36:00AM Vehicle 8062 Load 117%? ↩
3: 1h10 - 1h17 Mins at 8:10:57AM. 1:50 behind 8:12:00AM Vehicle 8111 Load 122%? ↩
Starting Monday, May 6 through Wednesday, May 22 from 9 a.m. to 3 p.m., there will be a westbound road closure at 17 Avenue S.W. between 6 Street and 7 Street S.W. for construction, 2-way traffic will be set up on the eastbound lanes. Routes 7 and 698 will have a stop closure.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.