Current time: 9:02:57AM Refresh
Remove ads by becoming a Premium User
• : 88-Harvest Hills at Beddington BV N on SB Centre ST N going Harvest Hills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 1:59 Mins at 9:04:56AM. Waiting 1:10:31. 13:56 behind 8:51:00AM Vehicle 1240 Load 244%? ↩ Last seen 1:02:01
2: 23 Mins at 9:26:56AM. Waiting 1:10:31. 5:56 behind 9:21:00AM Vehicle 1240 Load 73%? ↩ Last seen 1:02:01
3: 48 Mins at 9:51:00AM. Waiting 1:10:31. 0:00 behind 9:51:00AM Vehicle 1240 Load 80%? ↩ Last seen 1:02:01
4: 1h18 Mins at 10:21:00AM. Waiting 1:10:31. 0:00 behind 10:21:00AM Vehicle 1240 Load 100%? ↩ Last seen 1:02:01
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.