Current time: 7:29:05AM Refresh
Remove ads by becoming a Premium User
• : 88-Harvest Hills at 300 Harvest Grove PL NE on Harvest Hills DR going Harvest Hills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 7:29:05AM. Waiting 9:08. 17:53 behind 7:11:00AM Vehicle 1240 Load 104%? Last seen 9:08
2: 10 - 13 Mins at 7:39:09AM. Waiting 9:08. 0:17 ahead of 7:41:00AM Vehicle 1240 Load 39%? ↩ Last seen 9:08
3: 38 - 1h29 Mins at 8:07:44AM. Waiting 9:08. 31:49 behind 8:11:00AM Vehicle 1240 Load 207%? ↩ Last seen 9:08
4: 1h11 - 1h42 Mins at 8:40:43AM. Waiting 9:08. 0:36 behind 8:41:00AM Vehicle 1240 Load -4%? ↩ Last seen 9:08
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.