Current time: 7:03:45AM Refresh
Remove ads by becoming a Premium User
• : 88-Harvest Hills at Harvest Gold CI NE on NB Harvest Hills DR going Harvest Hills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 2 - 11 Mins at 7:06:33AM. Waiting 13:47. 28:14 behind 6:44:00AM Vehicle 1240 Load 98%?
2: 10 - 21 Mins at 7:13:45AM. Waiting 13:47. 2:21 behind 7:14:00AM Vehicle 1240 Load 14%? ↩
3: 43 - 1h11 Mins at 7:47:00AM. Waiting 13:47. 7:41 behind 7:44:00AM Vehicle 1240 Load 118%? ↩
4: 1h09 - 1h40 Mins at 8:13:22AM. Waiting 13:47. 14:39 behind 8:14:00AM Vehicle 1240 Load 123%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.