Current time: Refresh

Agencies » Halifax Transit

9A Greystone Inbound is on detour due to Construction in the area Started Jun 9 Until Jan 1 3000
More...

Remove ads by becoming a Premium User

 • : 9A-Greystone at Levis St on Herring Cove Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 - 7 Mins
at . 12:29 behind Vehicle 742 Load 174%? Many Seats Occupancy: 20% 9a Greystone- Fotherby Via Mumford

2: 11 - 18 Mins
at . 6:52 behind Vehicle 737 Load 115%? 9a Greystone- Fotherby Via Mumford

3: 13 - 21 Mins
at . 15:48 behind Vehicle 1174 Load 81%? 9a Greystone- Fotherby Via Mumford

4: 18 - 23 Mins
at . 3:04 ahead of Vehicle 741 Load 135%? 9a Greystone- Fotherby Via Mumford

5: 34 - 51 Mins
at . 3:23 behind Vehicle 1323 Load 183%? 9a Greystone- Fotherby Via Mumford

Stop closure Bell Rd After Robie St (6291) is closed for construction Started Mar 11 Until Jan 1 3000
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.