Current time: Refresh

Agencies » Los Angeles Metro

LINE 18: Buses will start using the 6th St. bridge starting Sunday, July 17. Started Jul 17 2022 (Updated Dec 11 )
Metro J Line 910/950 and 20 other routes detoured from 8:00 AM to 11:00 AM on Sat May 18 due to 2024 March for Babies. Starts May 18 Until May 18 (Updated May 17 )
More...

Remove ads by becoming a Premium User

 • : 18-Wilshire Western Sta-Montebello Via 6th - Whittier at Esperanza on Whittier going Montebello Metrolink Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 0:51 behind Vehicle 1924 Load 94%?

2: 10 Mins
at . 10:27 behind Vehicle 1720 Load 108%?

3: 14 Mins
at . 0:48 ahead of Vehicle 5774 Load 86%?

4: 20 Mins
at . 2:30 ahead of Vehicle 1848 Load 107%?

5: 30 Mins
at . 0:53 behind Vehicle 1706 Load 107%?

LINE 18 detoured from Wed May 1 to Fri May 17 every from 8:00 AM to 4:00 PM due to construction. The following stops are affected: 6th between Alexandria and Normandie (Westbound) Started Until (Updated May 17 )
Westbound: Regular route 6th St. and Kenmore Ave., then continue via 6th St., to L-Alexandria Ave., R-Wilshire Blvd., R-Normandie Ave., L-6th St., and regular route.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.