Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at 41st on Avalon going Tamcliff on Victoria

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 Mins
at . 0:37 ahead of Vehicle 3910 Load 147%?

2: 10 Mins
at . 5:34 behind Vehicle 3875 Load 62%?

3: 12 Mins
at . 2:12 ahead of Vehicle 4059 Load 48%?

4: 19 Mins
at . 5:58 ahead of Vehicle 6109 Load 87%?

5: 22 Mins
at . 1:07 behind Vehicle 5932 Load 43%?

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Sat Jul 6 at 4:00 PM due to construction. Started Apr 11 Until Jul 6 (Updated )
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.