Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at 14715 Avalon going Tamcliff on Victoria

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . 2:49 behind Vehicle 3882 Load 64%?

2: 22 - 30 Mins
at . 7:47 behind Vehicle 3910 Load 143%?

3: 35 - 38 Mins
at . 2:11 behind Vehicle 6109 Load 86%?

4: 45 - 57 Mins
at . 2:15 behind Vehicle 6114 Load 192%?

5: 1h02 - 1h09 Mins
at . 1:21 behind Vehicle 4038 Load 23%? Last seen 2:48

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Sat Jul 6 at 4:00 PM due to construction. Started Apr 11 Until Jul 6 (Updated )
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.