Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at 48th on Avalon going Wilshire on Westlake

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:16 Mins
at . 5:07 behind Vehicle 5867 Load 128%?

2: 4 Mins
at . 0:36 behind Vehicle 5993 Load 103%?

3: 15 Mins
at . 4:36 behind Vehicle 6013 Load 134%?

4: 23 Mins
at . 4:11 behind Vehicle 3865 Load 99%?

5: 24 Mins
at . 10:10 ahead of Vehicle 4038 Load 5%? Last seen 2:52

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Sat Jul 6 at 4:00 PM due to construction. Started Apr 11 Until Jul 6 (Updated May 14 )
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.