Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at 87th on Avalon going Wilshire on Westlake

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 1:19 ahead of Vehicle 5983 Load 33%?

2: 9 Mins
at . 0:20 ahead of Vehicle 3951 Load 82%?

3: 10 Mins
at . Waiting 9:45. 9:09 ahead of Vehicle 5942 Load 54%?

4: 10 Mins
at . Waiting 6:09. 3:29 ahead of Vehicle 5947 Load 86%?

5: 11 Mins
at . 22:49 ahead of Vehicle 4168 Load 10%?

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Sat Jul 6 at 4:00 PM due to construction. Started Apr 11 Until Jul 6 (Updated May 14 )
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.