Current time: Refresh

Agencies » Los Angeles Metro

Metro J Line 910/950 and 20 other routes detoured from 8:00 AM to 11:00 AM on Sat May 18 due to 2024 March for Babies. Starts May 18 Until May 18 (Updated May 17 )
More...

Remove ads by becoming a Premium User

 • : 55-Downtown L– Willowbrook Sta Via Compton Av at Imperial on Compton going Sunset on Figueroa

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . Waiting 15:37. 8:06 ahead of Vehicle 5796 Load 134%?

2: 23 - 28 Mins
at . 0:19 behind Vehicle 4092 Load 170%?

3: 34 - 42 Mins
at . 1:51 behind Vehicle 5790 Load 113%?

4: 48 - 52 Mins
at . 0:04 ahead of Vehicle 3874 Load 84%?

5: 1h08 - 1h18 Mins
at . 9:36 behind Vehicle 6093 Load 197%?

LINE 55 detoured until Fri Jun 7 at 4:00 PM due to construction. The following stops are affected: 41st / Compton (northbound) Started May 9 Until Jun 7 (Updated May 9 )
Northbound: Regular route 41st St. and Ascot Ave., then continue via 41st St., to R-Hooper Ave., R-33rd, L-Compton Ave. and regular route.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.