Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Base Line east of Wellington

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 - 17 Mins
at . 1:37 behind Vehicle 3344 Load 73%? King Edward via Wellington & Dundas

2: 34 - 40 Mins
at . 1:34 ahead of Vehicle 3375 Load 69%? 1a Pond Mills via Wellington & Dundas

3: 1h01 - 1h11 Mins
at . 1:52 behind Vehicle 3623 Load 114%? King Edward via Wellington & Dundas

4: 1h19 - 1h25 Mins
at . 1:45 ahead of Vehicle 3615 Load 66%? 1a Pond Mills via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.