Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Dufferin on Colborne

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:31 - 2 Mins
at . 2:40 ahead of Vehicle 3518 Load 73%? 1a Pond Mills via Wellington & Dundas

2: 17 - 26 Mins
at . 1:24 behind Vehicle 3372 Load 111%? King Edward via Wellington & Dundas

3: 46 - 51 Mins
at . 0:39 behind Vehicle 3153 Load 167%? 1a Pond Mills via Wellington & Dundas

4: 1h04 - 1h08 Mins
at . 0:27 ahead of Vehicle 3375 Load 106%? King Edward via Wellington & Dundas

5: 1h28 - 1h33 Mins
at . 1:39 ahead of Vehicle 3175 Load 149%? 1a Pond Mills via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.