Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Pall Mall on Colborne

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 - 19 Mins
at . Waiting 9:20. 1:02 behind Vehicle 3153 Load 93%? 1a Pond Mills via Wellington & Dundas

2: 37 - 39 Mins
at . 1:46 ahead of Vehicle 3375 Load 89%? King Edward via Wellington & Dundas

3: 1h03 - 1h05 Mins
at . Waiting 9:22. 1:32 ahead of Vehicle 3175 Load 101%? 1a Pond Mills via Wellington & Dundas

4: 1h22 - 1h25 Mins
at . 0:17 ahead of Vehicle 3372 Load 85%? King Edward via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.