Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Adelaide on Kipps

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 18 - 29 Mins
at . 7:21 ahead of Vehicle 3359 Load 77%? King Edward via Wellington & Dundas

2: 44 - 58 Mins
at . 9:06 ahead of Vehicle 3619 Load 94%? 1a Pond Mills via Wellington & Dundas

3: 1h16 - 1h25 Mins
at . 7:25 ahead of Vehicle 3615 Load 106%? King Edward via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.