Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Barker on Kipps

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 11 - 13 Mins
at . 2:28 behind Vehicle 3372 Load 45%? King Edward via Wellington & Dundas

2: 17 - 24 Mins
at . 1:12 behind Vehicle 3504 Load 18%? King Edward via Wellington & Dundas

3: 38 Mins
at . 0:14 ahead of Vehicle 3153 Load 46%? 1a Pond Mills via Wellington & Dundas

4: 58 - 1h02 Mins
at . 1:43 behind Vehicle 3375 Load 53%? King Edward via Wellington & Dundas

5: 1h22 - 1h26 Mins
at . 0:17 ahead of Vehicle 3175 Load 56%? 1a Pond Mills via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.