Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at McClary AVE on Wellington

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 5 Mins
at . 0:18 behind Vehicle 3375 Load 82%? 1a Kipps Lane via Wellington & Dundas

2: 32 - 36 Mins
at . 2:37 behind Vehicle 3175 Load 182%? 1b Kipps Lane via Wellington & Dundas

3: 57 - 1h00 Mins
at . 1:49 behind Vehicle 3372 Load 151%? 1a Kipps Lane via Wellington & Dundas

4: 1h23 - 1h26 Mins
at . 2:10 behind Vehicle 3153 Load 165%? 1b Kipps Lane via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.