Current time: Refresh

Agencies » London Transit

The following stop / stops are closed for Route 1: Wellington at Grey SB Started Feb 28 Until Jan 1 3000
Stop 1945 Wellington at Grey SB is closed while the road is under construction.
The following stop / stops are closed for Route 1: Wellington at South SB Started Feb 28 Until Jan 1 3000
Stop 1969 Wellington at South SB is closed while the road is under construction.

Remove ads by becoming a Premium User

 • : Route 1 at Colborne on York

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 25 - 40 Mins
at . 13:49 behind Vehicle 3615 Load 136%? 1a Kipps Lane via Wellington & Dundas

2: 49 - 57 Mins
at . 3:54 behind Vehicle 3344 Load 53%? 1b Kipps Lane via Wellington & Dundas

3: 1h12 - 1h19 Mins
at . 1:02 behind Vehicle 3375 Load 69%? 1a Kipps Lane via Wellington & Dundas

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.