Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL1-Logan Airport Terminals - South Station at Courthouse

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 0:03 ahead of Vehicle 1331 Load 102%? Logan Airport

2: 14 Mins
at . 0:25 ahead of Vehicle 1316 Load 96%? Logan Airport

3: 28 Mins
at . 3:54 behind Vehicle 1342 Load 148%? Logan Airport

4: 34 Mins
at . 0:32 behind Vehicle 1339 Load 74%? Logan Airport Last seen 1:14

5: 44 Mins
at . 1:18 behind Vehicle 1332 Load 109%? Logan Airport

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL3 detoured on Monday, May 20, from 10 PM to end-of-service, due to construction. Inbound service will be diverted to the Sumner Tunnel due to I-90 West Exit 135 closure . Starts May 20 Until May 21
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.