Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Airport

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 0:24 behind Vehicle 1322 Load 107%? Many Seats South Station

2: 19 - 20 Mins
at . 1:23 ahead of Vehicle 1306 Load 98%? South Station

3: 32 Mins
at . 0:45 ahead of Vehicle 1326 Load 109%? South Station

4: 46 Mins
at . 0:11 ahead of Vehicle 1311 Load 109%? South Station

5: 57 - 1h00 Mins
at . 2:52 ahead of Vehicle 1300 Load 91%? South Station

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL1 & SL3 detoured on Monday, May 20, from 10 PM to end-of-service, due to construction. Inbound service will be diverted to the Sumner Tunnel due to I-90 West Exit 135 closure . Starts May 20 Until May 21
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.