Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Courthouse

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 12 Mins
at . 0:04 behind Vehicle 1306 Load 94%? Chelsea

2: 33 Mins
at . 7:31 behind Vehicle 1326 Load 141%? Chelsea

3: 40 Mins
at . 1:49 behind Vehicle 1311 Load 50%? Chelsea

4: 52 Mins
at . 0:21 behind Vehicle 1300 Load 86%? Chelsea

5: 1h07 Mins
at . (Sched. based) 0:00 behind Vehicle 1322 Chelsea

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL3 experiencing delays of up to 20 minutes due to traffic Started Until
Silver Line - SL1 & SL3 detoured on Monday, May 20, from 10 PM to end-of-service, due to construction. Inbound service will be diverted to the Sumner Tunnel due to I-90 West Exit 135 closure . Starts May 20 Until May 21
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.