Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Silver Line Way

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . 8:48 behind Vehicle 1322 Load 139%? Few Seats South Station

2: 26 Mins
at . 16:50 behind Vehicle 1306 Load 154%? Many Seats South Station

3: 31 Mins
at . 8:09 behind Vehicle 1326 Load 37%? South Station

4: 45 Mins
at . 9:24 behind Vehicle 1311 Load 99%? South Station

5: 47 - 50 Mins
at . 3:05 ahead of Vehicle 1300 Load 11%? South Station Last seen 1:06

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL3 experiencing delays of up to 20 minutes due to traffic Started Until
Silver Line - SL1 & SL3 detoured on Monday, May 20, from 10 PM to end-of-service, due to construction. Inbound service will be diverted to the Sumner Tunnel due to I-90 West Exit 135 closure . Starts May 20 Until May 21
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.