Current time: Refresh

Agencies » Boston MBTA

Remove ads by becoming a Premium User

 • : SL3-Chelsea Station - South Station at Bellingham Square

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 Mins
at . 1:07 behind Vehicle 1322 Load 97%? Many Seats Chelsea

2: 24 Mins
at . 6:41 behind Vehicle 1306 Load 137%? Many Seats Chelsea

3: 47 Mins
at . 15:23 behind Vehicle 1326 Load 158%? Chelsea

4: 54 Mins
at . 9:57 behind Vehicle 1311 Load 53%? Chelsea

5: 55 - 58 Mins
at . 3:15 ahead of Vehicle 1300 Load 6%? Chelsea

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
Silver Line - SL3 experiencing delays of up to 20 minutes due to traffic Started Until
Silver Line - SL1 & SL3 detoured on Monday, May 20, from 10 PM to end-of-service, due to construction. Inbound service will be diverted to the Sumner Tunnel due to I-90 West Exit 135 closure . Starts May 20 Until May 21
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.