Current time: Refresh

Agencies » Boston MBTA

Franklin Line Train 713 (11:25 am from South Station) is operating 30-40 minutes behind schedule between Hyde Park and Forge Park due to an earlier mechanical issue. Started Until
Affected direction: Outbound

Remove ads by becoming a Premium User

 • : Franklin/Foxboro Line at Dedham Corporate Center going 718 South Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 24 - 25 Mins
at . 1:16 ahead of Vehicle 1816 Load 80%?

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Apr 7 2020
The door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible, Started Aug 30 2022
Foxboro Line Train 748 (12:31 pm from Foxboro) is operating near schedule between Readville and South Station. Started Until
Affected direction: Inbound

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.