Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 42-2nd-Spruce to Wycombe or61stPine at 3rd St - FS on Spruce St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 18 Mins
at . 3:00 behind Vehicle 8433 Load 147%? 61st-Pine

2: 18 - 28 Mins
at . 1:00 behind Vehicle 8487 Load 85%? Wycombe

3: 38 - 53 Mins
at . 6:44 behind Vehicle 3665 Load 273%? Wycombe

4: 49 Mins
at . 0:00 behind Vehicle 3017 Load 35%? 61st-Pine

5: 59 Mins
at . 0:04 behind Vehicle 3051 Load 107%? Wycombe

Street & Construction Started May 6 Until May 31
8:00am to 4:00pm on 5-6-24, to 5-31-24 Week days only, WB via Spruce, Right on 3rd, Left on Walnut, Reg. rt.
Construction Started Jan 14 Until Dec 31 2028
Until 1-1-29, EB via Chestnut, Right on 2nd, Layover on 38th Parallel, Place between Spruce &, Start of Bus Zone
Construction Started Jan 14 Until Dec 31 2028
Until 1-1-29, WB via 38th Parallel Place, Right on Spruce, Reg Rt
Trip cancellation for trip 731798.
Trip cancellation for trip 731798.
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 10:32 p.m. today. Started Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 10:32 p.m. today.
New Start/End Route Location Effective Jan. 14 Started Jan 13
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.