Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 45-Broad & Oregon to Noble & 12th at Ritner St on 11th St going Noble-12th

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 6 Mins
at . 0:46 behind Vehicle 3104 Load 104%? In long layover, last seen 21:58

2: 53 - 55 Mins
at . 0:54 behind Vehicle 3574 Load 195%? Last seen 1:13

3: 1h19 - 1h22 Mins
at . 1:19 behind Vehicle 3104 Load 99%? In long layover, last seen 21:58

Stadium Event Started Until
Until 12am 5/23/24, SB via10th, Right on bigler ( slow operation ), Right on Broad, Reg Rt
Street Paving Started Until
5/22/24 until 9:00am, NB via 7th Street, Left on Germantown, Right on 8th, Right on Lehigh, Left on 5th, Reg rt
Construction Started Apr 25 Until Dec 30 2024
until 12/31/24, SB discontinued transit stop, 12th & Locust.
Construction Started Oct 17 2022 Until Jun 30 2025
until 6/30/25, SB near side transit stop, discontinued at 12th & Vine., Board passengers SB far, side stop 12th & Vine at the, layover until further notice.
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 11:30 p.m. today. Started May 22 Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 11:30 p.m. today.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.