Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 47-Whitman Plaza to 5th-Godfrey at Champlost St on 5th St going Whitman Plaza

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 - 16 Mins
at . 0:03 behind Vehicle 8445 Load 115%? In long layover, last seen 6:14

2: 32 - 49 Mins
at . 6:12 behind Vehicle 3554 Load 151%?

3: 43 - 1h03 Mins
at . 5:07 behind Vehicle 3301 Load 99%?

4: 1h13 - 1h20 Mins
at . 4:31 behind Vehicle 8468 Load 197%? In long layover, last seen 22:51

PGW Started May 1 Until May 31
Monday - Friday, 6am - 3pm until 5-31-24, SB via 8th, Right on Washington Ave, Left on 10th, Left on Oregon, Reg Rt
Construction Started Apr 3 Until Jun 7
The transit stops located at, 8th & Market discontinued, until 06-07-2024 board, passengers at 8th &, Chestnut.
Construction Started Feb 29 Until Aug 30
24-7 until 12am on 8- 29-24, The transit stops located at, 7th & Fairmount, discontinued until 08-29-24.
Sink Hole Started Apr 4 Until Dec 31 2024
Until 12am on 1-1-25, SB via Franklin, Right on Poplar, Left on 8th, Reg Rt
Trip cancellation for trip 734767.
Trip cancellation for trip 734767.
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 5:15 p.m. today. Started Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 5:15 p.m. today.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.