Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 47-Whitman Plaza to 5th-Godfrey at Mifflin St on 7th St going 5th-Godrey

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 16 Mins
at . 0:00 behind Vehicle 8462 Last seen 4:42

2: 26 Mins
at . 0:00 behind Vehicle 3326 Load 100%? Last seen 4:41

3: 36 Mins
at . Waiting 5:02. 0:00 behind Vehicle 3527 Load 100%? Last seen 5:02

4: 48 Mins
at . 2:22 behind Vehicle 8261 Load 124%? Last seen 4:39

5: 56 Mins
at . 0:00 behind Vehicle 8445 Load 76%? Last seen 4:40

PGW Started Until May 24
7am -3pm until 5-24-2024, NB via Oregon Ave, Right on 9th, Right on Passyunk, Left on 7th, Reg Rt
PGW Started May 1 Until May 31
Monday - Friday, 6am - 1pm until 5-31-24, SB via 8th, Right on Washington Ave, Left on 10th, Left on Oregon, Reg Rt
Construction Started Apr 3 Until Jun 7
The transit stops located at, 8th & Market discontinued, until 06-07-2024 board, passengers at 8th &, Chestnut.
Construction Started Feb 29 Until Aug 30
24-7 until 12am on 8- 29-24, The transit stops located at, 7th & Fairmount, discontinued until 08-29-24.
Sink Hole Started Apr 4 Until Dec 31 2024
Until 12am on 1-1-25, SB via Franklin, Right on Poplar, Left on 8th, Reg Rt
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 11:27 p.m. today. Started Until
Due to operator unavailability, scheduled trips are subject to delays and cancellations until 11:27 p.m. today.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.