Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 17-Downtown/Oak at Bay 3 on Broadway-City Hall Station going 17 Oak

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 - 4 Mins
at . 7:16 behind Vehicle 2199 Load 208%? Last seen 1:39

2: 16 - 27 Mins
at . 1:41 ahead of Vehicle 2203 Load 201%? Last seen 1:29

3: 18 - 29 Mins
at . 14:59 behind Vehicle 2189 Load 91%? Last seen 1:38

4: 35 - 43 Mins
at . 1:10 behind Vehicle 2141 Load 152%?

5: 42 - 52 Mins
at . 0:02 ahead of Vehicle 2261 Load 78%? Last seen 1:55

17 Oak detour Fri May 24 & Sat May 25: From Robson and Seymour, via Seymour, Pender, resume regular route due to road block. Starts Until May 26
Stop 50815 Southbound Oak St @ W 67 Ave is temporarily closed from Wed May 29 at 10:00 PM to Thu May 30 at 5:00 AM due to construction. Starts May 29 Until May 30
Stop 61073 Southbound Cambie St @ Robson St is temporarily closed from Thu May 23 to Fri May 24, 7am-5pm daily, due to construction. Started Until May 24
17 Downtown detour from 6:00 AM to 11:00 PM on Sat May 25. Regular route to Smithe and Hamilton, then continue Smithe, Granville, then resume regular route due to construction. Starts May 25 Until May 25
Stop 50751 Northbound Oak St @ W 49 Ave is temporarily closed from Fri May 24 at 6:00 PM to Mon May 27 at 10:00 AM. Starts May 24 Until May 27
Affected routes:
017
17 Oak detour from 6:00 AM to 11:00 PM on Sat May 25. From Cambie St and Dunsmuir St, via Dunsmuir St, Richards St, Nelson St, Cambie Bridge, resume regular route due to construction. Starts May 25 Until May 25

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.