Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 49-Metrotown Station/Dunbar Loop/Ubc at Marguerite St on Eastbound W 49 Ave going 49 Metrotown Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 6 Mins
at . 0:57 ahead of Vehicle 12005 Load 84%? Last seen 1:38

2: 18 - 23 Mins
at . 0:12 behind Vehicle 16213 Load 108%? In long layover, last seen 16:54

3: 32 - 38 Mins
at . 0:03 behind Vehicle 12007 Load 92%? Last seen 1:31

4: 47 - 53 Mins
at . 0:06 behind Vehicle 12020 Load 100%? Last seen 1:43

5: 1h02 - 1h07 Mins
at . 0:02 ahead of Vehicle 12015 Load 98%? Last seen 1:27

Stop 61218 Langara-49th Station @ Bay 2 has temporarily moved 70 meters east from Tue May 21 to Fri May 24, 9:30am-3pm daily, due to construction. Starts May 21 Until May 24
Stop 52016 Westbound E 49 Ave @ Nanaimo St is temporarily closed from Wed May 22 to Fri May 24 from 7:00 AM to 3:30 PM daily due to construction. Starts May 22 Until May 24
Affected routes:
049

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.