Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 430-Metrotown/Brighouse Station at Mitchell Rd on Southbound Knight St going 430 Brighouse Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 29 - 35 Mins
at . Waiting 5:54. 1:05 behind Vehicle 9573 Load 180%? Last seen 5:54

2: 49 - 55 Mins
at . 1:14 behind Vehicle 9545 Load 96%? Last seen 1:56

3: 1h09 - 1h14 Mins
at . 0:08 behind Vehicle 16113 Load 90%? Last seen 1:34

Stop 56950 Eastbound Bridgeport Rd @ No. 5 Rd is temporarily closed Tue May 21 through Tue Jun 4 due to construction. Starts May 21 Until Jun 5
Stop 59704 Eastbound Bridgeport Rd @ Great Canadian Way is temporarily closed from Tue May 21 through Tue Jun 4 due to construction. Starts May 21 Until Jun 5
For 430 Metrotown service, board 170 meters east at Stop 56464 EB Bridgeport Rd @ Gage Rd.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.