Current time: Refresh

Agencies » Portland TriMet

Started May 15 2023
The Gateway Transit Center (Stop ID 10864) is closed due to construction. A temporary stop will be posted at the 2 bays prior just north of the crosswalk on the East side of the transit center. Started May 11
No service to the northbound stop on NE 99th & Glisan (Stop ID 8140) due to long-term construction. Use the temporary stop 50 feet north of construction on a parking sign. Started Jan 10 2023

Remove ads by becoming a Premium User

 • : 19-Woodstock/Glisan at Burnside Bridge on W Burnside

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 - 16 Mins
at . 0:22 ahead of Vehicle 3315 Load 88%?

2: 45 - 49 Mins
at . Waiting 10:12. 0:49 ahead of Vehicle 3512 Load 99%?

3: 1h15 - 1h18 Mins
at . 0:21 ahead of Vehicle 3905 Load 102%? 92nd (MAX Stn) on SE Flavel

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.