Current time: Refresh

Agencies » Portland TriMet

Started May 15

Remove ads by becoming a Premium User

 • : 52-Farmington/185th at 153rd on SW Farmington

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 - 6 Mins
at . 4:36 behind Vehicle 3033 Load 84%?

2: 25 - 28 Mins
at . Waiting 10:09. 1:42 behind Vehicle 3036 Load 46%?

3: 51 - 56 Mins
at . 3:46 behind Vehicle 3240 Load 109%? PCC Rock Creek Layover

4: 1h15 - 1h19 Mins
at . 4:04 behind Vehicle 3243 Load 101%? PCC Rock Creek Layover

Beginning Wednesday, May 15, through Friday, May 24, no service to the eastbound stops on SW Farmington at 179th (Stop ID 1688) and 195th (Stop ID
1693) on weekdays from 6:00 a.m. to 5:00 p.m. due to construction.
Started May 14

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.