Current time: Refresh

Agencies » Toronto TTC

This Monday through Friday, subway service on Line 1 between St Clair and Sheppard-Yonge stations will end nightly at 11 p.m. for planned track work. Shuttle buses will operate. Regular subway service will resume the following morning at 6 a.m. (Updated Jun 7 )
This Sunday, subway service on Line 2 Bloor-Danforth between St George and Broadview stations will start at 11 a.m. for planned work on the Prince Edward Viaduct. Shuttle buses will operate. Bay and Sherbourne stations will be closed until 11 a.m. (Updated Jun 7 )

Remove ads by becoming a Premium User

 • : 123-Sherway at Gair Dr on Evans Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 7:53 behind Vehicle 8086 Load 289%? 123B North to Kipling Station via East Mall and Shorncliffe

2: 6 Mins
at . 1:31 ahead of Vehicle 8067 Load 6%? 123C North to Kipling Station via North Queen and Shorncliffe

3: 23 Mins
at . (Sched. based) 0:00 behind Vehicle 8063 South to Long Branch via Shorncliffe and East Mall Last seen 6:13

4: 25 Mins
at . 5:56 behind Vehicle 8198 Load 179%? 123B North to Kipling Station via East Mall and Shorncliffe

5: 27 - 29 Mins
at . 1:17 ahead of Vehicle 8178 Load 27%? 123C North to Kipling Station via North Queen and Shorncliffe

123 Service change
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.